2-lane with Paved Shoulder of NH from Raisinghnagar - Pugal under Phase-I of Bharatmala Pariyojana (Package-2)

Development of the Project Highway shall include design and construction of the project highway. Two-Laning with paved shoulder shall include widening and strengthening of the Project Highway. Service roads at 9 chainages shall be constructed at a design length of 15.782 km on both sides.

Grade separated structures shall be provided at 9 design having a span arrangement of (1x12) & (20+30+20) respectively for each VUP structure. Ramps with 5.5 m carriageway and 6.5 m overall width on RE walls shall be provided on LHS and RHS after crossing the ROB to provide connection with existing Anupgarh-Vijaynagar Road with properly designed junctions.

  • Grade Separated Structures
    1. VUP = 9
  • At-grade Major Intersections/Junctions = 8
    1. Grade Separator = 6
    2. At grade junction = 2
  • At-grade Minor Junctions at Bypass and Re-alignment Locations = 92
  • Drains in Builtup Area = 11
  • Drains along Service/slip road = 9
  • Reconstruction of Existing RCC Box Culverts = 137
  • Widening of Existing Culverts = 48
  • Construction of New Culverts = 12
  • Reconstruction of Major Bridge = 1 (3x22)
  • Reconstruction of Minor Bridge = 1 (1x12.5)
  • Additional New Bridges = 8
    1. Culvert converted into bridge = 4
    2. Re-alignment -2
  • Road Over Bridge = 1
  • RE Wall = 9
    1. Total length = 7076 m