Independent Engineer Services for construction of 4-lane (Partial Access Controlled) Laddowal Bypass from Km 0.00 to Km 17.041 Linking NH-95 with NH-1 via Laddowal seed farm at Ludhiana in the state of Punjab on Hybrid Annuity Mode. REQUEST FOR ROPOSAL (RFP) Sept

The site of project includes construction of a dedicated Laddowal Bypass. The proposed bypass is taking off from designated leg of grade-separated junction of Southern Bypass with NH-95 running along Sidhwan Canal and passes via Laddowal Seed Farm at Ludhiana to meet NH-1 with an approximate length of 17.041 kms.

Initial length of approximately 4.5 Km of Bypass follows Sidhwan canal where bund roads exist on both sides and beyond that the bypass is to be built as a green field alignment. Service roads at 5 chainages shall be constructed at a design length of 15.13 km.
  • Grade Separators/Flyovers = 4
    1. PSC Girder resting on pile foundation = 3 (1x30)
    2. PSC Girder for both the spans resting on pile foundation = 1 (2x45)
  • Major Bridges = PSC I Girder = 1
  • Minor Bridges = PSC girder resting on pile foundation =1
  • Culverts = 26
    1. Pipe Culverts = 24
    2. RCC Box Culverts = 1
    3. Slab Culverts = 1
  • Major Intersections= 2
  • Minor Intersections = 23
  • At-grade improvements = 4
  • Pedestrian Underpass = 2