Widening of existing lane to double lane with paved sholders from Km.256.880 to Km 296.515 of NH 59.(Erstwhile Km. 400/000 to Km. 439/635 Km of NH 217) In the State of Odisha on EPC mode.

Development of the Project Highway shall include design and construction. Two lane with paved shoulder shall include strengthening of existing SL/IL. Two-Lanning with paved shoulder shall be undertaken. The carriageway shall be 7.0 m with 1.50 m paved shoulder on either side uniformly throughout the stretch.

  • Bridges = 5
    1. RCC T Beam = 3 (3x15)
    2. RCC Solid Slab = 1 (4x10.02)
    3. RCC Box Girder = 1 (1x30.04)
  • Major Intersections = 3
  • Minor Junctions =38
  • Culverts = 71
    1. Box = 55
    2. HPC = 16