Independent Engineer Services for supervision of Six Laning of Shamla ji to Motachilodha from km 401.200 to km 494.410 (Length 93.210 km) section of NH-8 in the State of Gujarat under NHDP Phase?V ( Package-VI) on Hybrid Annuity Mode.

The project road starts from Rajasthan/Gujrat Border at Km 401+200 of NH-8 and ends near Ahmedabad. The road passes through the Aravali, Sabarkantha, Gandhinagar and Ahmedabad District of Gujrat. Service roads shall be constructed at a design length of 117.06 km on both sides.

Rehabilitation and Upgrading from 2 Lane to 4/6 Lane with Paved shoulders of Yamunanagar Panchkula Section (km 106+357 to km 179+249) of NH-73 in the State of Haryana under NHDP Phase III. The site includes 19 Service Roads at 19 locations having a total length of 33.69 km.

  • Rail Over Bridges = 4
    1. RCC T-Beams = 3 (LHS)
    2. RCC Solid Slab = 3 (RHS)
    3. RCC T-Girder = 2 (LHS & RHS)
    4. PSC T-Beam = 2 (LHS)
  • Minor Bridges = 18
    1. Solid Slab = 22
    2. RCC T Girder = 12
    3. Frame Type = 2
  • Minor Bridges on Irrigation Canal
    1. Solid Slab = 1
    2. RCC Box = 1
  • Junctions = 30
    1. Major = 9
    2. Minor = 21
  • Minor Junctions (on Service road) = 80
  • Grade Separated Structure/ Flyovers = 9
    1. PSC T-Girder = 6 Lane Flyover
  • Vehicular Underpass = 8
    1. RCC T-Girder = 6 Lane
  • Light Vehicular Underpass = 12
    1. RCC Box = 6 lane
  • Cattle Under Pass = 1
    1. RCC Box = 6 lane
  • New Minor Bridges = 8
    1. RCC T-Girder = 5 (3 lane)
    2. Solid Slab = 3 (6 lane)
  • New Minor Bridge over Irrigation Canal = 1
    1. PSC I Girder = 6 lane
  • New Minor Bridge on service Road = 9
    1. RCC T Girder = 4
    2. Solid Slab = 5
  • Minor Bridge where Widening is proposed = 2
    1. RCC Solid Slab = 1
    2. Frame Type = 1
  • Slab Culvert to be Widened = 15
  • Slab Culverts to be Widened over Irrigation channel = 5
  • Box Culverts to be reconstructed = 2
  • Pipe Culverts to be Widened = 101
  • Pipe Culverts to be Widened over Irrigation Channel = 7 (HPC)
  • New Rail Over Bridge = 3
    1. Composite RCC Deck Slab with Steel I Girder = 3 lane
  • Rehabilitation/repair of Rail Over Bridges = 4
    1. RCC T Beam (central span) RCC Solid Slab (End Span) = 1 (skew)
    2. RCC T Girder = 1 (skew)
    3. PSC T Beam = 2