Consultancy services for authority?s engineer for supervision of construction of six laning of dedicated port road to krishnapatnam port (package-i) km 0+000 to km18+000 on epc mode in the state of andhra pradesh under bharatmala pariyojana phase I

Development of the Project shall include construction of the Project. Six Laning of dedicated Port road to Krishnapatnam Port (Package-1) Km 0+000 to Km 18+000 on EPC Mode including Minor Bridges, Culverts, Junctions, Bus shelters, drains etc. It shall include Six-Lanning with paved shoulder of the Project Highway.

The paved carriageway shall be 21 m of lane width and 3.0 m of paved shoulder. The total highway length shall be 19 km including Fly Over.

  • Underpass/Flyover = 5
    1. RCC Box = 5 (1x12)
    2. VUP = 4
    3. LVUP = 2
  • Grade Separated Structure = 1
    1. Flyover – PSC Girder (2x14.5)
  • Flyover (NH-16) = 1
  • Widening/Overlay with Built-up Area = 7
  • VUP = 4
  • LVUP = 1
  • Toll Plaza = 1
  • Major Junctions = 1
  • Minor Junctions = 5
  • Reconstruction of Pipe Culvert = 2
  • Reconstruction of Slab Culvert – 1
  • Widening of Existing Pipe Culverts = 15
  • Reconstruction of Existing Slab Culverts = 2 (1x4.81)
  • Major Bridges = 1
  • Minor Bridges = 2
  • Grade separated Structures
    1. Flyover – PSC Girder =1
    2. VUP – RCC Box = 4
    3. LVUP – RCC Box = 1